Short Lead Time for Sandwich Wall Panel - Polyurethane Foam PU Sandwich Panel – BoYuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our rewards are lower costs,dynamic profits team,specialised QC,potent factories,high-quality services for Thermal Conductivity Pu Panel , Insulated Roof Panel Alumneum Foil , External Wall Cladding Sheets , Welcome any inquiry to our company. We will be glad to establish friendly business relationships with you!
Short Lead Time for Sandwich Wall Panel - Polyurethane Foam PU Sandwich Panel – BoYuan Detail:

Material instruction

1)Suface sheet:

Usually the surface sheet of PUR or PIR sandwich panels is PPGI or PPGL steel color coated sheets.PPGI is prepainted galvanized coated steel and PPGL is prepainted Al-Zn coated steel.For coating type,you could choose PE, PVDF, HDP, SMP,ect.Our strategic cooperation brands are Bluescope, Bao-steel, Shougang steel, Guanzhou steel, Yieh Phui steel,Xinyu steel,etc.

Polyurethane Foam PU Sandwich Panel

2)Polyurethane core material:

Our polyurethane core material strategic cooperation brands are D·BASF, Huntsman, WANHUA, etc.

Sandwich panel surface effect

Polyurethane Foam PU Sandwich Panel

water ripple

Polyurethane Foam PU Sandwich Panel

square wave

Polyurethane Foam PU Sandwich Panel

Flat effect

Decorative gap to choose from

Decorative gap to choose from:

Properties of polyurethane sandwich panel:

Color range: offwhite,silver gray,sea-blue,crimson and so on
Insulated core:PU/PIR/PUR
Painting:Polyester coating PE,SMP coating,HDP coating,fluorocarbon coating PVDF,ect
Galvanzing:Hot-dip zinc coating,hot-dip aluminum-zinc coated

Allowable vertical load and heat transfer coefficient of polyurethane sandwich wall panel (allowable defiection f≦L/200)

Thickness

(mm)

Heat transfer coefficient

(W/m2k)

Weight

(kg)

Load

(KN/m2)

0.60

0.80

1.00

1.20

1.50

50 0.31 10.06 L(m) 3.52 3.04 2.69 2.42 2.11
75 0.21 11.06 L(m) 4.71 4.09 3.64 3.29 2.89
100 0.19 12.05 L(m) 5.76 5.02 4.47 4.05 3.56
120 0.16 12.84 L(m) 6.53 5.68 5.07 4.6 4.04
150 0.11 14.04 L(m) 7.56 6.58 5.87 5.32 4.68
Note:0.5mm outer steel sheet and 0.4mm inner steel

Allowable span and heat transfer coefficient of polyurethane sandwich roof panel (allowable defiection f≦L/240)

Thickness

(mm)

Heat transfer coefficient

(W/m2k)

Weight

(kg)

Load

(KN/m2)

0.60

0.80

1.00

1.20

1.50

50 0.31 10.15 L(m) 3.59 3.17 2.85 2.61 2.33
75 0.21 11.18 L(m) 4.64 4.07 3.66 3.34 2.96
100 0.19 12.22 L(m) 5.57 4.88 4.38 3.99 3.53
120 0.16 13.05 L(m) 6.28 5.49 4.92 4.48 3.97
150 0.11 14.30 L(m) 7.30 6.39 5.73 5.22 4.62
Note:0.5mm outer steel sheet and 0.4mm inner steel

Product detail pictures:

Short Lead Time for Sandwich Wall Panel - Polyurethane Foam PU Sandwich Panel – BoYuan detail pictures

Short Lead Time for Sandwich Wall Panel - Polyurethane Foam PU Sandwich Panel – BoYuan detail pictures

Short Lead Time for Sandwich Wall Panel - Polyurethane Foam PU Sandwich Panel – BoYuan detail pictures

Short Lead Time for Sandwich Wall Panel - Polyurethane Foam PU Sandwich Panel – BoYuan detail pictures


Related Product Guide:

We have been ready to share our knowledge of advertising and marketing worldwide and recommend you suitable products and solutions at most competitive price ranges. So Profi Tools supply you best benefit of money and we're ready to create with each other with Short Lead Time for Sandwich Wall Panel - Polyurethane Foam PU Sandwich Panel – BoYuan , The product will supply to all over the world, such as: Iran, Swiss, Saudi Arabia, All styles appear on our website are for customizing. We meet up to personal requirements with all products of your very own styles. Our concept is to help presenting the confidence of each buyers with the offering of our most sincere service, and the right product.
  • We are long-term partners, there is no disappointment every time, we hope to maintain this friendship later!
    5 Stars By Antonio from Holland - 2017.03.28 12:22
    The company comply with the contract strict, a very reputable manufacturers, worthy a long-term cooperation.
    5 Stars By Arthur from Chicago - 2018.10.31 10:02
    Write your message here and send it to us